SonicJobs Logo
Left arrow iconBack to search

VDC Engineer - Data Center Construction

Sundt
Posted 11 days ago, valid for 4 hours
Location

Haskell, TX, US

Salary

Competitive

Contract type

Full Time

Life Insurance
Disability Insurance
Employee Assistance
Flexible Spending Account
Wellness Program

By applying, a Sundt account will be created for you. Sundt's Privacy Policy and Terms & Conditions will apply.

SonicJobs' Terms & Conditions and Privacy Policy also apply.

Sonic Summary

info
  • The position requires a technical expert in modeling for various construction projects, focusing on creating 3D/4D/5D models.
  • Candidates must possess a minimum of 3 years of experience in blueprint/specification reading and in software such as Autocad, Revit, and Navisworks.
  • A 4-year degree in Construction Management, Engineering, or Architecture is required, along with at least 4 years of construction experience.
  • The role offers a market competitive salary, along with benefits like an Employee Stock Ownership Plan and 401K.
  • Sundt promotes a culture of ownership and is committed to equal opportunity employment, providing various wellness and educational assistance programs.

Job Summary

This position is the technical source of modeling information for various projects. The person that fills this role will need to have a thorough knowledge of construction documents, specification, and shop drawings.
Candidate will create 3D/4D/5D models of any given project.

Key Responsibilities

1.    Creates 3D models of Architectural, Structural and MEP systems.
2.    Maintains model libraries using correct uniformat or masterformat codes.
3.    Participates in activities to support the company's strategic planning efforts.
4.    Performs all primary job responsibilities of Virtual Construction Technician.
5.    Reviews bid scope documents for appropriate BIM language based on project delivery type and BIM deliverables.
6.    Trains virtual construction technicians in use of company approved software.
7.    Virtually walks through the model, identifying elements that are out of place.

Minimum Job Requirements

1.    3+ years blue print/specification reading.
2.    3+ years in Autocad/Revit/Navisworks/CPM scheduling software.
3.    4 year degree in Construction Management, Engineering or Architecture.
4.    4+ years' construction experience.
5.    Proficient use of all Microsoft Office Suite programs.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1.    May stoop, kneel, or bend, on an occasional basis
2.    Must be able to comply with all safety standards and procedures
3.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4.    Will interact with people and technology frequently during a shift/work day
5.    Will lift, push or pull objects pounds on an occasional basis
6.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7.    Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Non-Safety Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as
 
operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.


As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:
  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program



Learn more about this Employer on their Career Site

Apply now in a few quick clicks

By applying, a Sundt account will be created for you. Sundt's Privacy Policy and Terms & Conditions will apply.

SonicJobs' Terms & Conditions and Privacy Policy also apply.